Progress and everything!

Despite my lack of updates, I have still been progressing the build on a number of fronts and there is a bumper load of pictures for your perusal!

Since my last email, I have cast all of the wax cores for the intake runners though things were hampered slightly by the first set of moulds ‘drinking’ a couple of cores worth of wax, which meant I had to order some more wax! In addition, two of the carbon fibre lay ups failed to meet the required standard - I managed to blow a couple of holes in the heatshrink which turned out to be unrecoverable after curing so I also ran out of carbon sleeve.


Still, I now have 10 runners (8 good ones!) from which to build up the required manifold parts, though there are only 8 shown in the picture! Unfortunately, they will take a little more finishing than originally hoped due to the less than ideal surface finish from the heatshrink. I will have to wet sand them smooth before applying a finish coat of resin, which will get post-cured along with the bulk of the layup when I melt out the wax.
Onto the body work and probably the most dreaded part for fellow Gardner Douglas builders electing to carry out the finishing work themselves – the engine bay bulkhead. This is where two parts of the moulding meet and the join is usually a gap in the gel coat that needs to be filled.Some people choose to use body filler and paint, but I wanted to use the factory recommended method of using gel coat for a seamless and hard wearing finish.

Things went a little down hill from the start – the first problem encountered was the join itself was not so much a gap as a step in the moulding. Holding a straight edge against the panel showed around a 4mm gap at the worst point!


I persevered though and proceeded to key in the surface and mask off the entire panel with three layers of masking tape. The idea is to apply the gel coat and use the masking tape as a depth stop when skimming the surface then peel it off before curing. The top layer of gel does not cure in contact with oxygen (allows for a better bond for subsequent reinforcement when using it in a conventional layup), so this is removed with acetone before rubbing back the cured material to the desired level and finish.


Given the depth of the mis-match I had to use a number of coats to build up the required thickness, but I got most of the way there. I decided to flat back to a level before applying the finishing layer and this is where I noticed a colour mis-match between the gel I was applying (which matches the body) and the inner engine bay moulding. Apparently they are two similar, but different greys!

Since I would not be able to apply and feather out the correct grey across the whole bulkhead, and after a short bout of tourettes syndrome, I elected to use the body filler and paint approach.





This progressed quite quickly thanks to the warm weather and after a good period for properly hardening, I was able to polish it back to a reasonable finish.


The next job on the list was the footwell extension. This sits on the driver’s side and provides a wider area, particularly for the clutch pedal. This is supplied as a fibreglass moulding which needs to be trimmed and fitted with a peripheral neoprene seal and jack nuts to allow installation. I also elected to paint it body colour, just because I had a can spare from painting the bulkhead!







The only other area in which I have been working is the bonnet catch. I wasn’t keen on using the typical quarter turn locks that are used in the two rear corners of the bonnet, so I managed to track down a (slightly) more modern solution in the form of a unit from a mk2 golf. This requires an addition to the bonnet inner skin moulding to allow for mounting and fastener threads, so I need to make a small inlay of the correct form.




To achieve this, I have taken a moulding from the underside of the bonnet in the region of the new catch mounting and from this I will be able to make a copy of the skin. This can be built up the region in question, before using this as a plug for a new mould. It will all make sense shortly… I hope!

Monday, 19 May 2014

Big progress!

Quite an eventful time since my last update. I completed the second half of the plaster mould for making the intake manifold runner wax plugs. Unfortunately, of all the words I could use to describe the first trial, ‘successful’ does not even register! From my previous experiment, I learned that the mould needs to be warm otherwise the wax chills too quickly and leaves a very poor surface finish. This time around, I discovered that the plaster was so absorbent that is ‘drank’ virtually all of the liquid wax before it could freeze. As well as failing to make a wax plug, this meant that the mould surface was now waxy and I could not get any sealant to stick to it! I therefore had to rethink the all-plaster method and reverted back to the silicone and plaster ‘mother mould’ technique. This time however, I used a higher hardness silicone that holds its shape much better than the first material I trialled. Building on the first all-plaster mould, I also revised the closing box shape to lose a lot of the unnecessary volume. This made for a lighter part to ease handling, as well as minimising the face area of the tool, thereby reducing the chances of debris getting caught between the two halves and distorting the cavity alignment.

I started the mould by creating a wall around the plug into which I poured the silicone. This takes 24 hours to cure, then I added the registration markers (the black 'dots') and assembled the wooden case for pouring the plaster.



With this part cured, I could de-mould it, turn it over then apply Vaseline as a release agent to the first silicone half. I then built a a further plasticine wall before pouring the second half of the silicone


After 3 coats of mould release 'soap' to act as a barrier, this could then be boxed up to pour the second half of the plaster.


Finally, the mark 2 version of the mould is ready. I left it a week (with the two mould halves bound together to minimise distortion) allowing the majority of the moisture in the plaster to evaporate.


Nothing left now but to pour in the wax and hold a piece of dowel in place to act as a handle


The first part out of the mould  did not have a great surface finish, mainly due to the moisture still present in the plaster part of the mould condensing inside the cavity (despite the week I gave it to dry out). Further wax parts have greatly improved upon this as the plaster has dried out even more

With a usable wax master, I have been able to lay up a trial carbon fibre runner with a schedule of 2 layers of gel coat followed by 4 layers of carbon sleeve covered in a coated heat shrink tube for consolidation, all cured at room temperature. The post cure cycle (vital for parts exposed to elevated temperatures) even allowed the wax core to melt out as planned. There were a few cosmetic issues with this first part – a couple of runs in the gel coat and learning the best way to apply the sleeve layers – meant a less than ideal weave pattern on the outside. In addition, the heat shrink is very thin and therefore was a little tricky to work with (i.e. I burned a couple of holes in it before I turned down the wick on the heat gun!). This, along with the less than ideal internal surface finish from the first off wax, meant this was a sacrificial part only suitable for cutting up to see how well the composite had been laminated. I am pleased to report only a few small inclusions in the thickness of the wall and a couple of bubbles under the gel coat which should be avoidable with better consolidation between applying layers of sleeve. I have enough materials for a second trial (along with the 8 ‘good’ parts needed for the job), but hopefully I won’t need to cut up another one! Eight more to go then.



Other big news is that the body shell is finally complete and last week I travelled up to Newark to collect. I am very pleased with the colour combination and the photos don’t do it justice – bear in mind it is straight out of the mould with no polishing. Unfortunately, in all the excitement of getting it off the back of the Luton van (thanks for the additional muscle power, Neil!) I neglected to get a proper picture of it. The body will remain on its stand whilst I work inside the engine bay, then It can be mated with the chassis before carrying on assembly. I should then be able to get a good photo or two when it rolls out into the sun light as a (sort of) complete car!


First job is to apply stone chip to the inside of the wheel arches. Not the most glamorous of jobs, getting spattered in liquid rubber and cross eyed from the fumes, but 2 coats later, it is complete.


Next up is the fitting of the various panels - 2 in the wheel arches, bonnet and boot. This should keep me entertained for a little while!

Tuesday, 1 April 2014

Plug Progress!

A bumper update of photos this week! Recent progress has been centred around starting the composite work for the intake manifold. To this end, I have finally plucked up the courage to run my milling machine in anger. I have started by cutting the plug for the intake runner (1 per engine cylinder) from polyurethane tooling board which is quite a nice material that machines like a block of car body filler (Bondo to subscribers across the pond). A rough and finish path on either side of the block then it is a simple matter of cutting the supports away and cleaning up the stub left over.

This is a 2-sided part so alignment of the block to the machine is critical. This ensures that both tool paths line up when the part is broken out of the block. To this end, I used a finger clock to align the long axis of the part with the x-axis of the machine. Not an easy task given the less than ideal surface along this face!


I could then use an edge finder to zero the machine on the appropriate corner of the block


A rough pass saw the part taking shape


Finishing the first side, then roughing and finishing the second side (after repeating the alignment procedure) yielded a part ready to break out of the block. The more astute amongst you will notice the patches of lighter coloured material. During machining, the Z-axis (spindle up and down) come loose on me due to poor pulley alignment, causing the z-axis to loose its location. Fortunately, a bit of car body filler and locally running the finishing path allowed me to recover the part.


There is a 'pencil cleanup' option in the tool path generation software that supposedly would allow the machine to cut the part away from its supports, but I chose to do this manually on this occasion until I have a bit more confidence on using this option. I didn't want to write off a few hours of work at this point! I used a burr bit in a dremel to remove the supports and a quick clean up with 120 grit paper and I had the makings of my runner plug


Once machined, I had to apply the top coat to the plug in order to arrive a finish that could take a polish. This is not strictly necessary on this part since the down stream processes are unlikely to reproduce the finish exactly, but I felt it would be good practice in using the materials and techniques.

The finish comprises a couple of coats of tooling resin which is a 2-part coating that cures to a hard finish suitable for polishing. It is applied by brush (or spray if available), then cut back with progressively finer grades of wet and dry paper, ending in 1500 grit. I used black guide coat to ensure I had passed over the entire surface with each grade. The screws in the ends simply allow me to hang the part when the various layers a drying.


Then a switch to poilishing compound and a few coats of mould release wax for good measure.


With all of the master pattern finishing complete, I could turn my attention to the plaster mould. The split line on the part is particularly challenging as it is curved in two directions and since I was using a semi-hard tool, I would need to replicate it quite accurately, otherwise I would lock the part in one half of the tool. I finally figured out I could create a 3D CAD model of the required split line, then flatten it to provide a pattern which I could use to cut out pieces of thin styrene sheet.


This was flexible enough to form along either side of the plug, which would then guide the application of plasticine to form the sacrificial tool face. The remaining plasticine structure was formed and a number of domes were located to provide tool half to tool half alignment




. I could then form the shuttering around the part and pour the plaster.




Once cured, The shuttering and plasticine was removed, then the plaster trimmed back and cleaned up. Half way there!


From here, I will need to apply a release agent to prevent the other half from attaching itself during curing, rebuild the shuttering, then pour the second half of the tool. This will take a week or so to dry fully before I can use it in anger to make my wax plugs.

In the mean time, I have completed a couple of small jobs for the car itself – I have finally terminated the fuel lines with appropriate fittings. This involves a compression fitting on the pipe itself, which presents an ‘AN dash 6’ female thread, which in turn is converted to a typical push fit fuel line connector (with the red caps / masking tape plugs in the pictures). From here, I will need to make up the flexible lines, but they will have to wait until the body is installed.



I am still wanting for a confirmed collection date on the bodywork, but it should be ready soon. I still have plenty to keep me occupied in the mean time!

Monday, 23 September 2013

Just like buses...

...nothing for ages, then two updates together!

Some of the smaller jobs ticked off the list most recently include finally finding a solution to the thermostat housing problem. Having bought two aftermarket versions (which although nice and shiny, did not fit), I thought I would throw caution to the wind an source a genuine Ford part. Low and behold it dropped straight in with no issues! The only modification I needed was to drill and tap the optional fitting in the top so I could fit a secondary temperature sensor. This will be the sensor to drive the temperature gauge whereas the sensor in the normal position in the manifold will be reserved for the Engine Control Module. It is possible I could have used a single sensor for both, but there were potential buffering and ground loop issues having two processors reading the same sensor so I thought in the interest of fault diagnosis, two was better than one.

Carrying on the sensor theme, I have sourced an oil pressure sensor that GM use on their LS series of engines, and machined up an adaptor to allow connector to the normal ‘idiot light’ switch position on the engine block. As usual, nothing is ever that simple, and clearance to the block meant that the sensor would not simply screw into the same position, so the adaptor also had to relocate the sensor to a remote location. Fortunately, Ford have provided a suitable threaded boss in the water pump for just such an occasion. A short braided hose was also required to connect the two together, so another skill of hose assembly was learned.



The other sensor fitted recently was to read oil temperature. Once again, Ford have been kind enough to provide an easy route in the form of a  secondary drain plug in the sump. This is used to get all of the oil out that would otherwise be trapped by the ‘hump’ of the oil pan that clears the sub frame normally running under the engine. I was able to reverse engineer the thread used on this fitting and machine up an adaptor for the sensor. It is not at the lowest point on the chassis but it is still a little vulnerable, so this will get some kind of skid pan to protect the connector and wiring.


Since the sensors will be read by a microprocessor, I have not been able to use the more typical 1-wire senders as the earth path through the block typically affects the measurements. I have therefore had to use 2-wire sensors which are more difficult to come by, and even harder to find suitable data sheets. Fortunately, the GM LS engines are used quite a lot in aftermarket installations (they will sell a whole crate engine if you want), and more data is available on the spares. I therefore have a Ford engine, but controlled and monitored using GM sensors – fingers crossed they will work together without getting into a fight!

Other progress has been the fitting of the clutch slave cylinder and making up the braided hose for the hydraulic line and I have now collected the rear part of the exhaust from Gardner Douglas. This connecting pipes will need modifying (or replacing) to meet up with my own design headers, but it gives me a head start in terms of known good routing under the chassis and bodywork.



As for the milling machine, I have now connected the motors to the various slides and successfully run through a sample program. There are a couple of parts to finish on the spindle drive and I will then be in good shape to start test cutting.