Tuesday, 28 August 2012

Let the games begin

A bumper update this week thanks to the long weekend. Since receiving the chassis and borrowing a spare bonnet from the kit manufacturer, I have been working away at creating a CAD model. This was finished up to the necessary level ahead of the weekend so I could break out the tools and start building!



The build manual recommends assembling the rear axle off the chassis, then lowering the framework around it. This seemed like a sensible approach, so I made it the first task as manoeuvring a bare chassis sounded easier than moving a partially assembled one. The rear axle is straight out of the donor Jaguar with the lower wishbones pivoted off the differential. This means that the pivot mounting brackets determine the toe and thrust of the rear wheels and have to be carefully aligned with shims. The brackets that hold the assembly into the chassis are drilled to provide the correct alignment (in theory), so I set about mocking up the pivots to determine the correct shims. I will still have to measure the alignment when the axle is complete to finally check the toe and thrust measurements, but this should give me a good start. 


With the shims established, I could fix the lower pivot brackets and make my first attempt at lockwiring the bolt heads, which proved easier than anticipated (when you wrap the wire the correct way around the bolt head!).


 The rest of the rear axle assembly continued as per the Haynes (Chilton) manual including shimming of the rear brake discs (rotors) to centralise them in the callipers and assembly of the rear brake callipers. The assembly of the inner pivot tubes proved to be fun thanks to the multitude of spacers, thrust washers and seal retainers, but the liberal application of grease held everything together long enough to assemble the pivot shaft without a pile of bits on the floor!


At this stage, the driveshafts and rear uprights would be fitted, but as I am still waiting on parts to complete their assembly, I moved on to fitting what I had to the chassis. This was simply a case of lowering the rear of the frame over the assembly and fitting 8 bolts.




With the rear assembly as complete as I could make it, I moved onto preparation for engine installation. This involved fitting the two fuel lines (feed and return for the injection system) along with the brake pipes. The fuel lines were installed using brackets I designed and a work colleague machined for me (thanks Colin), held in with rivnuts. 



The brake lines use a series of push-in clips and these (along with the fuel line clamps) have to be spaced to provide sufficient support as this is inspected at the Individual Vehicle Approval (IVA) test. Most of the fitting was relatively straightforward, however the front brake pipe proved more challenging due to the tortuous route under the engine mounting bracket. Two sore thumbs later and I was ready to fit the engine and gearbox assembly.



The chassis design allows for excellent access for this job and the only hindrance was a lack of manoeuvring space for the engine crane. It turned out to be easier to lift the engine up and slide the chassis under it before rolling the crane (and engine) into place. The engine mounts were bolted into place and the powertrain was in its new home. The gearbox tail housing is currently sat on a piece of wood until I can fabricate the rear mounting bracket.




With the engine installed, I was able to turn my attention to the front suspension. As per the rear axle, this is lifted straight from the Jaguar donor and bolts up to the chassis in the same way. The only real deviation is the bespoke steering arm to suit the new rack as well at the omission of the various shields. This concluded my weekend of construction – not bad for a few days work!



There is still some work to complete the front suspension assembly – making up a new pair of rigid brake pipes from the calliper to the flexible hose as well as setting up the front angles – camber, castor and toe. The geometry will be much easier to work on when I have the steering rack so this will have to wait for suitable funds! At least I can amuse myself with designing the intake system in the mean time.

Monday, 26 March 2012

Driveline

With the engine substantially built (minus the induction system), I have been able to turn my attention to the transmission. When this engine is used in passenger cars and if attached to a manual transmission, the clutch is actuated by a cable. Unfortunately, this is not very Cobra friendly (especially when fitted in a right hand drive car), so the typical approach that my peers take is to fit a hydraulic conversion. Never one to take the easy route, I am working on constructing my own conversion using more readily available parts rather than rely on a £200 ‘kit’ that doesn’t really fit according to some who have used it. To this end, I needed to measure the clutch actuation force at the release (throw out) bearing to allow me to calculate the mechanical advantage and movement required at the pedal. Fortunately, we have a hydraulic press at work which, when coupled to a load cell and dial gauge, proved to be very useful for collecting the required data!


In addition, I was able to complete the fabrication of the engine cradle which allowed me to remove the engine from the build stand and access the rear of the block. This allowed the installation of the final core plug (at the end of the cam shaft) along with the oil gallery plugs.


These were followed by the block plate, flywheel and clutch which then allowed me to ‘dial in’ the bellhousing. This is achieved by fitting a dial gauge to the clutch and measuring the runout of the bellhousing location diameter when turning the crank. The bellhousing is mounted on offset dowels which can be rotated to get the runout below the 0.005” target specified by the transmission supplier.


With this completed, all that remained was to fit the transmission itself which proved to be easier than expected thanks to judicious use of my engine crane to take most of the not insignificant weight! I also fabricated a transmission support ‘foot’ at the same time as the engine cradle to allow the whole driveline assembly to be wheeled about as required. Now all it needs is a chassis around it!

Next steps involve the re-assembly of the donor suspension components for which I am currently collecting all of the new bearings, seals, shims, and fasteners. I now therefore need to switch from the UNC threads used on the engine, to the UNF threads (along with a couple of fine Metric threads for good measure) used by Jaguar in the 60’s. Hopefully I won’t get them mixed up!