Showing posts with label Instruments. Show all posts
Showing posts with label Instruments. Show all posts

Monday, 23 September 2013

Just like buses...

...nothing for ages, then two updates together!

Some of the smaller jobs ticked off the list most recently include finally finding a solution to the thermostat housing problem. Having bought two aftermarket versions (which although nice and shiny, did not fit), I thought I would throw caution to the wind an source a genuine Ford part. Low and behold it dropped straight in with no issues! The only modification I needed was to drill and tap the optional fitting in the top so I could fit a secondary temperature sensor. This will be the sensor to drive the temperature gauge whereas the sensor in the normal position in the manifold will be reserved for the Engine Control Module. It is possible I could have used a single sensor for both, but there were potential buffering and ground loop issues having two processors reading the same sensor so I thought in the interest of fault diagnosis, two was better than one.

Carrying on the sensor theme, I have sourced an oil pressure sensor that GM use on their LS series of engines, and machined up an adaptor to allow connector to the normal ‘idiot light’ switch position on the engine block. As usual, nothing is ever that simple, and clearance to the block meant that the sensor would not simply screw into the same position, so the adaptor also had to relocate the sensor to a remote location. Fortunately, Ford have provided a suitable threaded boss in the water pump for just such an occasion. A short braided hose was also required to connect the two together, so another skill of hose assembly was learned.



The other sensor fitted recently was to read oil temperature. Once again, Ford have been kind enough to provide an easy route in the form of a  secondary drain plug in the sump. This is used to get all of the oil out that would otherwise be trapped by the ‘hump’ of the oil pan that clears the sub frame normally running under the engine. I was able to reverse engineer the thread used on this fitting and machine up an adaptor for the sensor. It is not at the lowest point on the chassis but it is still a little vulnerable, so this will get some kind of skid pan to protect the connector and wiring.


Since the sensors will be read by a microprocessor, I have not been able to use the more typical 1-wire senders as the earth path through the block typically affects the measurements. I have therefore had to use 2-wire sensors which are more difficult to come by, and even harder to find suitable data sheets. Fortunately, the GM LS engines are used quite a lot in aftermarket installations (they will sell a whole crate engine if you want), and more data is available on the spares. I therefore have a Ford engine, but controlled and monitored using GM sensors – fingers crossed they will work together without getting into a fight!

Other progress has been the fitting of the clutch slave cylinder and making up the braided hose for the hydraulic line and I have now collected the rear part of the exhaust from Gardner Douglas. This connecting pipes will need modifying (or replacing) to meet up with my own design headers, but it gives me a head start in terms of known good routing under the chassis and bodywork.



As for the milling machine, I have now connected the motors to the various slides and successfully run through a sample program. There are a couple of parts to finish on the spindle drive and I will then be in good shape to start test cutting.

Monday, 7 November 2011

Virtual Cobra Build

With another batch of engine parts delivered, I have been progressing the block build up although missing a couple of vital items off the order means I am not as far as I could have been! Still, it gives me the chance to prepare the parts properly while I wait so I have colour matched the timing cover and water pump to the block.

In addition, I have been working on the installation of a vital part of the fuel injection system – the crank position sensor. Since the stock version of this part is prohibitively expensive to buy new and there aren’t many Mustangs in scrap yards around here, I have bought a more readily available standard component and designed a combined bracket and timing pointer along with a suitable trigger wheel.


Other ‘virtual’ progress has been around the design of the instruments and I have decided that an illumination test is required before committing to a proper PCB. I therefore need to mock up the instrument face and back lighting to ensure I have sufficient brightness to meet the Individual Vehicle Approval (IVA) test requirements. To this end I have designed a first pass circuit (which I should be able to build at work thanks to the prototype PCB facility here at work) and a ‘mask’ to direct the light. This is designed to be water jet cut along with the timing pointer components and some other instrument parts so I am aiming to group these together and procure them in the near future. Once these are in, I can build and test a number of aspects of the design before finalising the board design and getting it manufactured properly.



Tuesday, 9 August 2011

Bearing Up (or out)

Despite the lack of Cobra updates, I have not been totally idle. Since my last update, I have been slowly completing the engine disassembly, to the point where all that remained were the cam bearings. These need to be removed for the machining work, the fact that they are worn out is incidental at this stage! A cam bearing is typically removed or installed using an expanding mandrel to hammer it in or out. I have heard some stories of bearings being damaged by this process, so I decided to design a tool to wind them out and in on a thread. I then turned the required parts (5 different bearing sizes so 5 individual mandrels!) and gave them a test. Success! The 5 bearings came out without a hitch.






The other area of progress has been on the gauges. I have never been keen of the normal kit car approach of a set of aftermarket warning lamps festooning the dash, so I thought I would take a more contemporary approach. To this end I have decided to attempt to manufacture my own gauges so I can integrate the lamps within the dial faces. This has taken quite a lot of research, but I am now at the stage where I have a schematic and board layout for the minor gauges (fuel level, water temperature), along with a plan for the major gauges (speedo, tacho). Oil monitoring (pressure and possibly temperature) will be achieved with the use of an LCD which will also provide trip and mileage information. There is still a long way to go on these, but it seems to be in the right direction so far.