Tuesday, 9 August 2011

Bearing Up (or out)

Despite the lack of Cobra updates, I have not been totally idle. Since my last update, I have been slowly completing the engine disassembly, to the point where all that remained were the cam bearings. These need to be removed for the machining work, the fact that they are worn out is incidental at this stage! A cam bearing is typically removed or installed using an expanding mandrel to hammer it in or out. I have heard some stories of bearings being damaged by this process, so I decided to design a tool to wind them out and in on a thread. I then turned the required parts (5 different bearing sizes so 5 individual mandrels!) and gave them a test. Success! The 5 bearings came out without a hitch.






The other area of progress has been on the gauges. I have never been keen of the normal kit car approach of a set of aftermarket warning lamps festooning the dash, so I thought I would take a more contemporary approach. To this end I have decided to attempt to manufacture my own gauges so I can integrate the lamps within the dial faces. This has taken quite a lot of research, but I am now at the stage where I have a schematic and board layout for the minor gauges (fuel level, water temperature), along with a plan for the major gauges (speedo, tacho). Oil monitoring (pressure and possibly temperature) will be achieved with the use of an LCD which will also provide trip and mileage information. There is still a long way to go on these, but it seems to be in the right direction so far.



Monday, 9 May 2011

Oily and Greasy part 3

The lower rear wishbones represent the last of the donor suspension parts that I needed to clean and protect, so it was out with the wire brushes, and a fresh tub of elbow grease at the ready. These took some effort, mostly from their sheer size and weight, however they are fully cleaned and painted now.


Some replicas shorten the rear drive shafts and wishbones to give a more 'original' look to the rear wheel offset (deep dish on the rear wheels) however, most Gardner Douglas kits do not do this and mine will not be an exception. I still need to procure most of the bearings, spacers, shims, shields, washers and the other 101 parts that make up the working elements of the suspension, but for now I am happy that what I have is good to go into storage until needed.

The other source of grease and oil (the engine) has also received some attention. I purchased a cut-out short block which needed final disassembly and assessment for machining requirements. All was going well until I removed piston number 8 (actually, it fell out of the block once I had freed the big end – this was not a good sign!) Upon closer inspection, It appears that this piston had made a bid for freedom from the engine through the exhaust valve in the form of aluminium vapour. Apparently, it is a known fault with engines of this age in certain vehicle installations where part of the induction system becomes blocked, forcing cylinder 8 to run lean. If it is left unchecked, it gets to the point were detonation occurs which eventually melts the piston – this is what appears to have happened in my engine. The upshot of it all is that the remains of the oil ring scratching the nicely honed surface along with aluminium being smeared up and down the bore means a re-bore and new pistons all around. At least I had budgeted for this!





I now need to put together a shopping list of all the parts required to turn this into a fire-breathing Cobra power plant, along with a list of banks I might raid to pay for it all!

Tuesday, 19 April 2011

Power

It was a big day yesterday with the collection of my Cobra's powerplant core - the engine. To call it an engine is a bit of a stretch since it is a short block (block, camshaft, crankshaft, pistons and con rods) however, since everything missing (and even some of the things fitted) will be replaced with new, it saves me the job of stripping down and scrapping the rest of the engine. The all important casting numbers on the side of the block indicate it was cast week 26 of 1993 which is just what I was looking for:

  • This age of engine has a one-piece rear crank seal which is better leak free solution
  • The crank has 50oz external unbalance which makes finding a flywheel for it marginally easier
  • It has a roller lifter camshaft of which there are more fuel injection friendly cam profiles available
  • The emissions test it will eventually have to pass during its IVA (individual Vehicle Approval) test has non-catalytic converter emissions limits. I therefore do not need to purchase and install cats in the exhaust system saving time, effort and cash!




From here, I need to finish stripping it down and assess just how much machining is required. At the very least I will be likely zero decking it (to raise the compression ratio), and boring it to remove the current wear marks. A decision on crank grinding will have to wait until I can measure the journals, but the general condition of the working parts suggest this may not be necessary.

Oily and Greasy take 2

More rust stripping, cleaning and painting has occurred with the completion of the vast majority of the donor suspension parts.


One particularly stubborn output yoke proved a little difficult in separating it from its seal track, but access to more 'industrial' tools at work and they soon parted company. This along with the two lower rear wishbones represent the last steel suspension parts requiring the POR15 treatment. The rear uprights still need a good going over, but as they are aluminium they will require a different approach

Tuesday, 29 March 2011

Oily and Greasy

To balance my work on the nice and clean circuit design and software writing, I decided to get some muck work under way. To this end I have started reconditioning the donor parts. The first task is to strip it all down and clean up, then protect with a suitable finish. The donor parts came from the scrap yard in major chunks which required final disassembly.


Front upright assembly as supplied from the scrap yard
After a flurry of activity with hammers, sockets and a handy press, I reduced it to its component parts:


Some people choose to grit blast and powder coat, but many use the POR15 system so I thought I would give it a try. The process requires the loose rust removing, then a good clean with 'Marine Clean' followed by a coat of 'Metal Ready' to neutralise the rust and provide a zinc phoshpate coat. Finally, two coats of POR15 and you are finished. If the parts are to be exposed to direct sunlight, a UV barrier is recommended. Since these are suspension parts, I don't need to worry about that.

I set about cleaning the rust and grease off using wire wheels and paint srtipping wheels in my drill. Once reasonably clean, I could move onto applying the POR15 system. The paint covers well and the scond coat was applied when the first was 'dry with a slight finger drag' as required by the instructions. I trialled the system on the two front lower wishbones and two front uprights:



It seems to have gone reasonably well, so I need to press on with the remaining donor parts

Oil and Grease Free

Despite my lack of updates, I have not been idle on my Cobra project. I have mostly been working on the 'cleaner' aspects of the job, concentrating on some of the electronics I will be using. First off, I finished the Megasquirt auxiliary board and since it was a two layer (top and bottom copper) layout, I have had it made by one of the many PCB prototyping houses. This was recently delivered:



A quick check in the enclosure with the vehicle connector in place:


Now all I need to do is solder it up and give it a test!

In addition, I have been developing the vehicle electrical system and have decided on at least trying to build my own electrical modules. These will cover the instruments, direction indicators and heating controls. So far I have identified the use of a Picaxe Programmable Integrated Chip (PIC) as supplied by Revolution Education. These have a simple BASIC programming laguage and are used for a whole host of projects, mostly by hobbyists. This system will allow me to control the blower and heater solenoid valve, flash the indicators and drive instrument stepper motors, and display information such as miles covered and ambient temperature. A lot of work will be required to get these moduiles up and running, but I think they will be worth it in the end.

Wednesday, 5 January 2011

Single Plane Manifold

A new year and a new set of results...

As with the dual plane manifold, I have created a CAD model that lets me simulate and analyse the air flow down individual runners of the single plane manifold:


The model was run under the same conditions as the dual plane manifold i.e. each inlet valve is opened in sequence and a pressure drop applied to approximate the piston velocity. The simulation is then interrogated for the mass flow into each cylinder. The mass flow variation against the average for each cylinder is shown below:


The average mass flow was 18% higher in the single plane manifold when compared to the dual plane design indicating that the engine would be able to breathe more easily and hence produce more power with this type of manifold (unfortunately it does not represent an 18% gain in power due to the complex flow conditions present when the engine is drawing air in sequence with the firing order, not the simple steady state conditions of the simulation). However, it can be seen that the cylinder-to-cylinder variation is still in the order of the dual plane design (-20% / +10% variation) indicating that this manifold is also not ideal for a port fuel injection application. Either manifold is suited to a carburettor or throttle body injection since the air-fuel ratio is established at the throttle plate rather than the valve.

Given the above information and a distinct lack of a readily available stock port fuel injected manifolds on this side of the pond (I didn't like the look of it much anyway!), I have decided to look at the possibility of fabricating my own. The CAD work I have done to date suggests a twin-plenum design would be the best for packaging around the known hard points. Watch this space...